Prelude FLNG Mammoth Starts Journey to Australia

Shell’s Prelude floating liquefied natural gas (FLNG) project, the world’s largest offshore facility ever constructed, has started its journey from South Korea to Australia.

According to AIS data provided by MarineTraffic, the 300,000 gross ton vessel departed Samsung Heavy Industry’s Geoje shipyard in the early hours of June 29.

The 488-meter-long Prelude FLNG will be towed over 3,000 nautical miles by Terasea Hawk, Tereasea Falcon and Terasea Osprey, operated by Singapore-based offshore service contractor POSH Terasea. AIS data shows that the vessel is scheduled to arrive at Australia’s Browse Basin on July 30.

Once it reaches its destination, the FLNG facility will be positioned before it begins production at the Prelude gas field in the Browse LNG Basin, 108 nautical miles off the northwest coast.

The Shell Prelude FLNG facility features a fully loaded displacement capacity of about 600,000 tons, and has around 260,000 tons of steel in the facility alone.

World Maritime News Staff

Share this article

Follow World Maritime News

In Depth>

Events>

<< Aug 2017 >>
MTWTFSS
31 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3

CWC World LNG & Gas Series: 10th Asia Pacific Summit

Bringing together the key LNG buyers and sellers from across the globe, the Summit provides…

read more >

Europort 2018

From 15-17 May 2018, the 12th edition of Europort Romania willl take place in the IDU Hall in Constanta…

read more >

Defence Safety Conference Supported by The Defence Safety Authority, UK MoD

The Defence Safety Conference is the first of its kind exclusively dedicated to safety across the defence domain…

read more >

Singapore International Bunkering Conference and Exhibition (SIBCON)

The 20th edition of the Singapore International Bunkering Conference and Exhibition (SIBCON) will be about inspiring change…

read more >