Iv-Consult Selected for the Gode Wind Project

The detail engineering department of Iv-Consult has begun making the workshop drawings of two topsides of converter platforms, each approximately 1250 tons, for the Gode Wind 01 and 02 Wind farm projects.

This project is for Iemants Steel Constructions N.V. in Belgium.

Gode Wind 01 and 02 are offshore wind farm projects are located northwest of Nordreney in the German sector of the North Sea. The projects are developed by Dong Energy.

The capacity of Gode Wind 01 will be 332 megawatts and Gode Wind 02 will have a capacity of 252 megawatts. The cable capacity is 900 megawatts HVDC (High Voltage Direct Current), suitable for connections to other wind farms. The connection to the mainland is guaranteed by TenneT.

It is expected that the wind farm will be fully operational in 2016.

 

April 23, 2014

Share this article

Follow World Maritime News

In Depth>

Events>

<< Jun 2019 >>
MTWTFSS
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

World Gas Series: Morocco Summit

Bringing together key players in the gas value chain in Morocco, the World Gas Series:

read more >

GreenTech in Shipping USA Forum 2019

GreenTech in Shipping USA Forum is an event for Maritime leaders who want to unlock successful business formula of the industry!

read more >

Shipping Transformation Asia

Shipping Transformation Asia will provide a platform for future-focused discussion in the shipping,…

read more >

Global Sustainable Shipping Forum 2019

The event will provide valuable insights from conference sessions, great networking opportunities and will offer…

read more >