Becker Marine Awarded Building Contract for First LNG Hybrid Barge

Hamburg-based Hybrid Port Energy GmbH, a subsidiary of Becker Marine Systems GmbH & Co. KG, has awarded a building contract to Shipbuilding and Machinery of Komárno, Slovakia to build the world’s first LNG Hybrid Barge.

In summer 2012 AIDA Cruises and Becker Marine Systems teamed up on a long-term cooperation project to provide low emission electrical power to cruise ships while at port. The barge will be fitted with 5 Generator Sets supplied by Zeppelin Power Systems totalling 7.5 MW for 50/60 Hz operating solely on LNG. These are the first marine classified LNG Caterpillar engines to be delivered to customers.

The LNG Hybrid Barge will be delivered by summer 2014, only two years after the initial project startup. The 74 m long barge will be stationed in the Port of Hamburg, which will then be the first port in  Europe able to provide cold ironing power to cruise ships. In addition, the barge and its engines are to be outfitted to supply combined heat and power to potential customers, further improving the ecological footprint.

Becker Marine, December 2, 2013

Share this article

Follow World Maritime News

In Depth>

Events>

<< Sep 2019 >>
MTWTFSS
26 27 28 29 30 31 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6

Defence Safety Conference 2019

The Defence Safety Conference returns to London this October as the only event solely dedicated to enhancing safety across all aspects of defence.

read more >

Shipping Transformation Asia

Shipping Transformation Asia will provide a platform for future-focused discussion in the shipping,…

read more >

3rd MarSat Workshop

The MARSAT project wants to operationalise and standardise EO products and aims to develop…

read more >

Global Sustainable Shipping Forum 2019

The event will provide valuable insights from conference sessions, great networking opportunities and will offer…

read more >