Allseas to Build Single-Lift Vessel Larger than Pieter Schelte

Swiss-based Allseas has decided to build a second single-lift platform installation and decommissioning vessel. 

The new vessel, larger than Pieter Schelte, can remove all platform topsides in the North Sea which are beyond the capability of Pieter Schelte.

Besides decommissioning, the vessel is designed for worldwide installation of very large topsides.

The topsides lift capacity will be 72,000 metric tons, exceeding the capacity of Allseas’ Pieter Schelte by 50%.

The vessel will have a width of 160 m (525 ft), whereas Pieter Schelte is 124 m (406 ft) wide. She will be operational in 2020.

Allseas, November 11, 2013

 

 

Share this article

Follow World Maritime News

In Depth>

Events>

<< Sep 2019 >>
MTWTFSS
26 27 28 29 30 31 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6

Defence Safety Conference 2019

The Defence Safety Conference returns to London this October as the only event solely dedicated to enhancing safety across all aspects of defence.

read more >

Shipping Transformation Asia

Shipping Transformation Asia will provide a platform for future-focused discussion in the shipping,…

read more >

3rd MarSat Workshop

The MARSAT project wants to operationalise and standardise EO products and aims to develop…

read more >

Global Sustainable Shipping Forum 2019

The event will provide valuable insights from conference sessions, great networking opportunities and will offer…

read more >