Wartsila AQUARIUS®EC BWMS Receives IMO Type Approval

Wartsila has today announced that its Wartsila AQUARIUS®EC (Electro-Chlorination) Ballast Water Management System (BWMS) has been granted International Maritime Organization (IMO) Type Approval.

This is in accordance with the requirements of the 2004 IMO Convention for the control and management of ships’ ballast water and sediments and is an essential certification pre-requisite for the system to be used onboard ships.

The Type Approval was attained in co-operation with the Flag Administration of the Netherlands, independent testing facilities, and the Lloyds Register classification society. Testing and optimization of the system were carried out during both land-based and shipboard trials conducted in accordance with IMO requirements.

Additional testing is planned to ensure full United States Coast Guard (USCG) Type Approval for the Wärtsilä AQUARIUS®EC BWMS.

This is the second Wärtsilä BWMS to have been fully endorsed and type approved by the Flag Administration of the Netherlands, and represents the culmination of Wärtsilä’s dedicated development programme that was initiated in 2010. The Wärtsilä AQUARIUS®UV BWMS was granted IMO Type Approval in 2012 and USCG Alternate Management System (AMS) acceptance in October 2013.

The time required to complete Type Approval for an electro chlorination (EC) system is longer, as the EC treatment process makes use of an active substance that requires both intermediate Basic and Final approval from IMO GESAMP as pre-requisites to a Type Approval application.

Compliance with the IMO Ballast Water Convention helps protect local eco-systems from the spread of harmful invasive species, while easing operational concerns for ship owners and operators.

The Wärtsilä AQUARIUS®EC BWMS is based on a two-stage treatment process using proven and validated system components. Upon uptake, seawater is first passed through a back washing screen type filter. The filtered seawater then passes through a static mixer where hypochlorite generated in a side stream electrolysis process is injected and mixed to disinfect the water before entering the ballast tank.

On discharge, water from the ballast tanks is pumped through the static mixer for a second time and residual chlorine (if any) is neutralized prior to discharge. The filter is not used during discharge. The modular approach provides maximum flexibility for system design and installation. Key components are positioned to suit available space, a major advantage when considering retrofit projects.

Retrofit installations can be carried out either during dry docking, at the quayside, or whilst the ship is in operation, thus minimising downtime.

 

Press Release, December 16, 2013

Share this article

Follow World Maritime News

Posted on December 16, 2013

In Depth>

Events>

<< May 2019 >>
MTWTFSS
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

GreenTech in Shipping USA Forum 2019

GreenTech in Shipping USA Forum is an event for Maritime leaders who want to unlock successful business formula of the industry!

read more >

CWC World Gas & Power Series – Brazil & the Americas Summit

CWC World Gas & Power Series: Brazil & the Americas Summit is the perfect meeting place to make contacts…

read more >

FPSO Brazil Congress 2019

Charging ahead with 24 planned orders by 2022, Brazil has once again solidified its status as one of the world’s foremost oil and gas leaders…

read more >

Nor-Shipping 2019

Nor-Shipping’s conference and event programme is tailored to deliver the knowledge, value and networking to help you build your business.

read more >