Video: Both Floating Docks at Damen Shiprepair Curaçao Up and Running

Damen Shiprepair Curaçao (DSCu) commissioned its floating D-dock on November 22, making both of its floating docks operational.

Following the mooring of D-dock to its moorings on November 16th, final tests were carried out and D-dock was submerged onto the equalized seabed, ready for the first visiting vessel the Jara. The vessel is a Damen ASD Tug 3110 (L 30.82m x W 9.40m x D 4.08m) owned by Citgo Aruba.

The commissioning of the D-dock comes weeks after the company put into operations its Panamax C-dock, measuring 230 x 45 metres.

Both C and D docks arrived jointly at the Caribbean island of Curaçao on 30th April, 2018 and are part of a USD 40 million investment program at DSCu, following its takeover by Damen in 2017.

The yard now has four drydocks, two graving and two floating docks.

Floating dock
                                                               Image Courtesy: Damen

Image and Video Courtesy: Damen

Share this article

Follow World Maritime News

In Depth>

Events>

<< Nov 2019 >>
MTWTFSS
28 29 30 31 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 1

Maritime Reconnaissance and Surveillance Technology

As varied threats in the Mediterranean Sea continue to proliferate, the need to advance…

read more >

CrewConnect Global 2019

CrewConnect Global is the leading forum for collaboration to advance new industry approaches to seafarer recruitment and training.

read more >

CruiseConnect Global 2019

Attend CrewConnect Global and stay on for the CruiseConnect Summit to take part in an industry-wide conversation focused…

read more >

CWC World LNG Summit & Awards Evening

The CWC World LNG Summit & Awards Evening will be returning to Rome in 2019 to celebrate it’s 20th year.

read more >