Hejre Platform Planted in North Sea

Hejre Platform Planted in North Sea

The 8.400-tonne jacket for the Hejre platform, arrived at its location in the Danish sector of the North Sea on May 22, and the last steel pile for fastening the legs of the support structure was rammed into the subsoil on May 30.

”Our people on the project and our suppliers have done a fantastic job in delivering and installing the jacket in the North Sea.

Now, we enter a new project phase. where we will be drilling the production wells, installing the oil and gas pipelines and modifying the Gorm E platform from which the oil will be transported to shore,” said Flemming Horn Nielsen, head of DONG Energy’s Danish oil and gas business.

The launch of the jacket from a barge into the North Sea took less than one minute.The ballast tanks of the barge were filled with water, making it tilt slightly, so that the giant steel construction slid into the sea.

The fitted floating tanks and compartments in the construction kept it floating, before it was erected to a vertical position in a controlled process and lowered onto the seabed.

Drilling of the production wells will commence in the near future.

June 3, 2014

Share this article

Follow World Maritime News

In Depth>

Events>

<< Jul 2019 >>
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31 1 2 3 4

World Gas Series: Morocco Summit

Bringing together key players in the gas value chain in Morocco, the World Gas Series:

read more >

GreenTech in Shipping USA Forum 2019

GreenTech in Shipping USA Forum is an event for Maritime leaders who want to unlock successful business formula of the industry!

read more >

Shipping Transformation Asia

Shipping Transformation Asia will provide a platform for future-focused discussion in the shipping,…

read more >

Global Sustainable Shipping Forum 2019

The event will provide valuable insights from conference sessions, great networking opportunities and will offer…

read more >