Grandweld Lays Keel for ADNOC’s 42m Crew Boat

Grandweld, a fully integrated shipyard providing shipbuilding, ship repair, and engineering solutions, has laid keel for ADNOC’s (Abu Dhabi National Oil Company) 42m Aluminum Crew Boat.

Contract for the vessel was signed on December 31st 2013, and the keel laying ceremony was held on April 17th 2014.

The vessel will be powered by three high speed diesel engines driving three fixed pitch propellers and capable of developing a speed in excess of 21 knots. The boat shall be a Fast Crew Boat with diving support capability to provide various services required in the offshore operations.

The vessel has 30 persons crew seating capacity, more than 100 sqm loading area for over 90 Tons of deck cargo requirements, and specially designed wheelhouse and crew cabins to achieve highest quality standards and maximum space utilization and comfort.

Delivery of the vessel is scheduled for December 31, 2014.

The vessels will be operated by ADNOC, and will be utilized to transport personnel and support offshore oil & gas operations.

 

April 22, 2014

Share this article

Follow World Maritime News

In Depth>

Events>

<< Sep 2019 >>
MTWTFSS
26 27 28 29 30 31 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6

The Smart Ship Exchange

The Exchange will look at the issues involved with increasing autonomy in shipping with an introduction to the concept…

read more >

3rd MarSat Workshop

The MARSAT project wants to operationalise and standardise EO products and aims to develop…

read more >

Global Sustainable Shipping Forum 2019

The event will provide valuable insights from conference sessions, great networking opportunities and will offer…

read more >

OEE Conference & Exhibition 2019

OEE2019 is organised by Ocean Energy Europe, the industry association representing ocean energy in Europe.

read more >