Grandweld Lays Keel for ADNOC’s 42m Crew Boat

Grandweld, a fully integrated shipyard providing shipbuilding, ship repair, and engineering solutions, has laid keel for ADNOC’s (Abu Dhabi National Oil Company) 42m Aluminum Crew Boat.

Contract for the vessel was signed on December 31st 2013, and the keel laying ceremony was held on April 17th 2014.

The vessel will be powered by three high speed diesel engines driving three fixed pitch propellers and capable of developing a speed in excess of 21 knots. The boat shall be a Fast Crew Boat with diving support capability to provide various services required in the offshore operations.

The vessel has 30 persons crew seating capacity, more than 100 sqm loading area for over 90 Tons of deck cargo requirements, and specially designed wheelhouse and crew cabins to achieve highest quality standards and maximum space utilization and comfort.

Delivery of the vessel is scheduled for December 31, 2014.

The vessels will be operated by ADNOC, and will be utilized to transport personnel and support offshore oil & gas operations.

 

April 22, 2014

Share this article

Follow World Maritime News

In Depth>

Events>

<< Jan 2020 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

The 9th Annual Event Green Shiptech China Congress 2020

The 9th Annual Event- Green Shiptech China Congress 2020 will be held on next…

read more >

Maritime Reconnaissance and Surveillance Technology

As varied threats in the Mediterranean Sea continue to proliferate, the need to advance…

read more >

2nd GREENTECH IN SHIPPING GLOBAL FORUM

Forum you will find out from the regulators, government bodies and major ports’ representatives what the near…

read more >

7th Annual Arctic Exchange

Every year the Exchange invites delegates from across the globe to come together to listen to key senior management teams…

read more >