Aibel Lands Topside Engineering Contract

Aibel’s Singapore office will perform topside engineering services for the Catcher project with BW Offshore Singapore.

The scope includes detailed engineering services for around 7,800 tonnes of topsides modules for the Catcher FPSO (Floating Production Storage and Offloading). The project represents a substantial amount of work for the Singapore office this year and into 2015. At its peak it will engage around 130 employees.

Aibel’s Singapore office has previously performed the FEED for the Catcher FPSO topsides as part of an integrated team with BW Offshore.

The project team is mobilizing immediately to ensure a smooth start.

 

aibel, April 7, 2014

Share this article

Follow World Maritime News

In Depth>

Events>

<< Nov 2019 >>
MTWTFSS
28 29 30 31 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 1

The 9th Annual Event Green Shiptech China Congress 2020

The 9th Annual Event- Green Shiptech China Congress 2020 will be held on next…

read more >

CWC World LNG Summit & Awards Evening

The CWC World LNG Summit & Awards Evening will be returning to Rome in 2019 to celebrate it’s 20th year.

read more >

Salvage & Wreck

Salvage and Wreck Removal Conference will focus on Casualty management case studies, Dealing with hazardous cargo and container ship fires…

read more >

Maritime Reconnaissance and Surveillance Technology

As varied threats in the Mediterranean Sea continue to proliferate, the need to advance…

read more >