Sections of Roerborg Bound for Germany

Huge ring sections for m.v. Roerborg, being built at shipyard Ferus Smit, are placed on the car park as well as the slipway of shipyard Royal Niestern Sander.

The ring sections, built by Niestern Sander, will be loaded on a barge before they can be shipped to Leer, Germany.

Sections of Roerborg Bound for Germany

The m.v. Roerborg measuring 169.75m in length, a width of 20.4m and depth of 13.75m is the sister vessel of m.v. Reestborg and m.v. Reggeborg. These 23,000 DWT dry cargo multipurpose vessels are equipped with two box shaped holds.

The expected delivery of the m.v. Roerborg is August next year.

 

Press Release, December 9, 2013

Share this article

Follow World Maritime News

Posted on December 9, 2013

In Depth>

Events>

<< Apr 2020 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

The 9th Annual Event Green Shiptech China Congress 2020

The 9th Annual Event- Green Shiptech China Congress 2020 will be held on next…

read more >

Belgian Offshore Days 2020

During this event, a conference will be held with focus on “Increasing value by data driven innovation…

read more >

Europort Romania

Europort Romania is the premier maritime networking event of the Black Sea and will connect maritime technology and service suppliers with high level professionals from Romania and surrounding shipbuilding markets.

More info

read more >

MARITIME INDUSTRY 2020

The future of the maritime sector is the point of focus during Maritime Industry 2020.

read more >