Naval Shipyard Gdynia Completes Repairs of ORP Bałtyk

Naval Shipyard Gdynia S.A. has completed the overhaul of the warship ORP Bałtyk (fuel tanker with the ship’s side number Z-1).

The scope of overhaul included among other things: maintenance of the hull, superstructure, open decks and tanks. Furthermore, the shipyard carried out repairs of the main cooling water over-board system and bottom-side fittings, as well as repair of tail shafts along with adjustable propellers

Besides the above, scope of the works also included repair of the thruster, rudder’s set along with steering gear and cathodic protection system as well as survey of log and echo sounder.

 

Press Release, November 25, 2013

 

 

Share this article

Follow World Maritime News

Posted on November 25, 2013

In Depth>

Events>

<< Jul 2019 >>
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31 1 2 3 4

World Gas Series: Morocco Summit

Bringing together key players in the gas value chain in Morocco, the World Gas Series:

read more >

GreenTech in Shipping USA Forum 2019

GreenTech in Shipping USA Forum is an event for Maritime leaders who want to unlock successful business formula of the industry!

read more >

Shipping Transformation Asia

Shipping Transformation Asia will provide a platform for future-focused discussion in the shipping,…

read more >

Global Sustainable Shipping Forum 2019

The event will provide valuable insights from conference sessions, great networking opportunities and will offer…

read more >