Chengxi Shipyard Starts M/V Osakana's Conversion

Chengxi Shipyard has announced today that the block erection within M/V Osakana’s conversion project has started.

Being the first of four general cargo vessels from Masterbulk intended for the Jumboising conversion, M/V Osakana’s conversion will include the following: installation of a ring block (13.5 meters in length, 32.26 meters in breadth, 21.0 meters in height, and 700 tons in weight) after cutting of the body at FR77-950; building of a hatch cover of about 90 tons and installation of a washing tank in the No.5 port ballast tank; along with laying of pipelines and cables etc.

The repair part entails about 350 tons of steel work. With the change of vessel’s longitudinal strength after the jumboising, reinforcement of the main deck, longitudinal hatch coaming as well as the bottom shell plates will follow.

M/V Osakana is scheduled to come to Chengxi for conversion in November and the second vessel MV Okiana will arrive at the shipyard in December.

Press Release, August 28, 2013

 

Share this article

Follow World Maritime News

Posted on August 28, 2013

In Depth>

Events>

<< Oct 2018 >>
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31 1 2 3 4

Ocean Energy Europe Conference & Exhibition 2018

The annual Ocean Energy Europe Conference & Exhibition is the meeting point for the whole ocean energy sector…

read more >

Europort 2018

From 15-17 May 2018, the 12th edition of Europort Romania willl take place in the IDU Hall in Constanta…

read more >

CWC World LNG & Gas Series: 10th Asia Pacific Summit

Bringing together the key LNG buyers and sellers from across the globe, the Summit provides…

read more >

Offshore Energy Exhibition & Conference (OEEC)

It is unique in bringing together the oil and gas, offshore wind and marine energy industry…

read more >