Drydocks World to Build ‘Dubai Expo 2020 NS’ Mega Jack-Up Rig

Drydocks World, the world renowned international service provider to the maritime, oil & gas and energy sectors, signed an Agreement with Drill One Capital for building the “Dubai Expo 2020 NS” mega Jack-up rig.

Gusto MSC which is one of their major partners in this project has designed the CJ 80 rig and the rig will be the first of this design to be built and will be the largest Jack-up rig ever built. Designed to be operated in harsh environments including the Norwegian Sector of the North Sea at a maximum water-depth of 175 meter with 25 meter air-gap, the rig is another ground-breaking project among the growing portfolio of new build projects for the offshore oil & gas being implemented by Drydocks World.

From inception the UAE government strategy and Dubai in particular are focused on putting our industry at the forefront and whatever we do to be in the lead and globally No.1. Today we have entered into the next stage of technology and design by building a green Rig which take the oil industry to a new level. It is a demonstration of DDW capability to build world first mega projects as we demonstrated in previous projects such as ‘The Shell Prelude FLNG turret, Solan storage tank and DolWin beta’, and now building this global first and largest rig. It is a testament from the offshore industry on the DDW capability to deliver and puts us into the lead and the yard of choice. We seek to develop our capabilities in building highly specialized units for the offshore oil & gas sectors and are gearing up for more innovative and technology-intensive projects that would serve the emerging needs of the energy sector,” said His Excellency Khamis Juma Buamim, Chairman of Drydocks World & Maritime World.

Drydocks World to Build 'Dubai Expo 2020 NS' Mega Jack-Up Rig2

The 101 X 110 m, 5500 sqm unit will be classed by DNV and will meet all rules and regulations in force in the Norwegian and the UK sector of the North Sea. It can be operational at a depth of 175 m in standalone mode. The rig is totally environmentally friendly – up to 30% less fuel consumption due to use of latest fuel efficient technology; tier 3 compliant; generates fresh water using waste heat from engine cooling; heat by hot water generated from exhaust waste heat; LED lighting where possible; reduced emission of CO2 and Nox – Up to 25% reduction in emission compared to similar rigs; prepared for shore power; zero discharge to sea to meet Norwegian and UK legal requirements (fluids less than 15 ppm contamination).

The design draft is 8.5 m, minimum operational water depth is 20 m and length of legs is 232 m. It is designed to accommodate a total of 160 persons preparing the unit to be used as a drilling and production unit. The rig will be equipped with the latest available state-of-the-art drilling equipment to be able to drill to 40.000 ft drilling depth. The rig will be equipped with a total of four high pressure (7000 psi) mud pumps.

Drydocks World, January 13, 2014

 

 

Share this article

Follow World Maritime News

In Depth>

Events>

<< Oct 2019 >>
MTWTFSS
30 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3

CruiseConnect Global 2019

Attend CrewConnect Global and stay on for the CruiseConnect Summit to take part in an industry-wide conversation focused…

read more >

CEDA Dredging Days 2019

CEDA Dredging Days programme will follow its successful format of contributed peer-reviewed…

read more >

Offshore Wind Europe 2019

#OWEU19 is a meeting place for governments, developers and suppliers to grow the confidence in wind power. Perfect to grow your business by securing new customers, meeting officials and industry heads.

read more >

6th Mozambique Gas Summit & Exhibit

This year’s edition will have a revamped programme for attendees.

read more >