USA: NNS Installs Third Elevator on Aircraft Carrier Gerald R. Ford

Huntington Ingalls Industries announced yesterday that its Newport News Shipbuilding (NNS) division installed the third and final aircraft elevator on the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78).

The elevator, which is used to move aircraft from the hangar bay to the flight deck quickly and safely, is located on the starboard side of the ship. It measures 85 feet long and 52 feet wide and weighs 120 tons, akin to a steam locomotive.

“The Ford class is designed with three aircraft elevators, one less than the Nimitz class,” said Rolf Bartschi, NNS vice president, CVN 78 carrier construction. “The design provides greater flight deck area for increased sortie rates over the Nimitz-class design. The location and number of aircraft elevators are an integral part of the design.”

Gerald R. Ford’s primary hull structure reached 100 percent structural completion in May, bringing more than three years of structural erection work to a close. Work continues on the ship, including work on the piping and electrical systems and habitability areas such as the galley and mess spaces. Shipbuilders are also in the process of painting the hull prior to the ship’s christening, scheduled for Nov. 9.

HII, August 16, 2013

Share this article

Follow World Maritime News

In Depth>

Events>

<< Feb 2017 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 1 2 3 4 5

9th Annual Coasts and Marine Structures 2017 Conference

Discover Best Practise Strategies for Design, Planning, Construction and Asset Management

To remain competitive, Australian port operators must plan, design, manage and maintain their assets more creatively and proactively to meet future demands and drive profitability.

With this in mind, the Coast and Marine Structures Summit 2017 will focus on key considerations relevant to ensuring your existing assets are maximised and prepared to accommodate bigger vessels.

Hear from 20+ global experts including Maritime/Coastal Engineers, Contractors, Port Authorities and more, including GHD (USA), Indonesian Port Corporation (Asia), G-Group Consulting (New Zealand), Ausenco (Australia), Port Authority NSW (Australia), to name a few.

By attending this 2-day conference, you’ll learn about:

– Innovative planning and design of ports to create efficiencies that drive profit
– Best practice asset management strategies and new PIANC design principles for bulk terminals
– Proactive asset management and maintenance to improve durability and maximise and extend asset lifecycles
– Alternative material and protection techniques trialled and tested in the US and Europe
– Strategies to shift organisational culture and mindset from asset management to asset maintenance
– How you can leverage technology to increase the efficiency of your marine structures
– Case studies on retrofitting, expanding and upgrading your ports in cost-effective ways

More info

read more >

European Shipping Week 2017

European Shipping Week is intended to be a platform where policy-makers from the main EU institutions will meet and engage with European…

read more >

SNS2017 – The Southern North Sea Conference & Exhibition

EEEGR’s flagship Southern North Sea conference is the most important event for the energy sector in the East of England…

read more >

Seatrade Cruise Global

For more than 30 years, Seatrade Cruise Global has been the leading international exhibition and conference serving the cruise industry…

read more >