Maersk Drilling Secures GoM Contract for Its Drillship Under Construction

Maersk Drilling Secures GoM Contract for Its Drillship Under Construction

More than one year prior to delivery Maersk Drilling has signed a contract with a major oil company for the first in a series of four identical ultra deepwater drillships currently under construction.

The contract duration is three years and commencement is expected by end 2013 upon delivery from Samsung Heavy Industries in South Korea and mobilization to the US Gulf of Mexico. The estimated contract value is USD 610 million including mobilisation, but excluding cost escalation and performance bonus.

“With the signing of this contract for the first of our four ultra deepwater newbuild drillship we are able to add another USD 610 million to our contract backlog providing a solid basis for our further growth,” says Claus V. Hemmingsen, CEO of Maersk Drilling and member of the Executive Board of the A.P. Moller – Maersk Group. “The US Gulf of Mexico remains a focus area of Maersk Drilling, and we are pleased to enhance our presence in this attractive market. With permitting activity normalizing after the Macondo incident in 2010 and the lease sales in the region, we believe the fundamental demand for our services in this region is in place”.

Maersk Drilling has performed deepwater operations in the US Gulf of Mexico since 2009 with the ultra deepwater semi-submersible MÆRSK DEVELOPER.

Facts about the four newbuild ultra deepwater drillships

In 2011 Maersk Drilling ordered four ultra deepwater drillships at Samsung Heavy Industries in South Korea. The rigs will be delivered in 2013 and 2014. The total investment was USD 2.6 billion.

The design and capacities of the new drillships include features for high efficiency operation. Featuring dual derrick and large subsea work and storage areas, the design allows for efficient well construction and field development activities through offline activities.

With their advanced positioning control system, the ships automatically maintain a fixed position in severe weather conditions with waves of up to 11 metres and wind speeds of up to 26 metres per second.

Special attention has been given to safety onboard the drillships. Equipped with Multi Machine Control (MMC) on the drill floor, the high degree of automation ensures safe operation and consistent performance. Higher transit speeds and increased capacity will reduce the overall logistics costs for oil companies.

Source: Maersk Drilling, June 4, 2012

Share this article

Follow World Maritime News

In Depth>

Events>

<< Jul 2015 >>
MTWTFSS
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

Marintec South America

Marintec – South American Maritime Exhibition for Shipbuilding, Platform and Maintenance

As part of the UBM/Seatrade portfolio, Marintec South America is a trade-show for anyone who wants to stay ahead in the maritime market.

Why visit?

  • Be inspired by thousands of products and services on show
  • Find out what´s new in the market by chatting to suppliers and peers
  • Come away with genuine solutions, exciting ideas, and a fresh outlook
  • Pick up new ideas from the experts of industry through our seminar sessions and technical presentation

Why Exhibit in Rio de Janeiro/ Brazil?

  • Rio de Janeiro is the headquarter of Petrobras and its mains shipyards / ship owners
  • Rio de Janeiro is an international reference center for training of professionals for the offshore oil and gas industry
  • Brazil produces over 2 million barrels of oil per day and the offshore production will double this by 2020
  • The Brazilian shipbuilding industry has been grown 19,5% per year since 2000
  • Investments in the industry should exceed BRL 200 billion before 2020
  • The oil and gas industry reached about 12% of the total Brazilian GDP and may reach 20% by 2020
  • The offshore exploration will move R$ 3.7 trillion over the next 30 years and will generate 87 million jobs
  • Petrobras’ total pre-salt needs estimate: 97 platforms, 510 support vessels and 140 oil tankers

Read more about the conference here.

read more >

3rd Annual LNG Bunkering 2015 Conference

IBC’s ‘LNG Bunkering Summit’ returns for the 3rd time, with a view to profile latest developments and opportunities in key trade routes globally, and particularly in Singapore.

Join your industry partners as they crack the ‘chicken and egg’ dilemma while focusing on first-mover benefits, infrastructure, supply and pricing that makes switching to LNG a viable option.

The 3rd LNG Bunkering Summit is part of a suite of events in The Bunkering Week, which incorporates 3 co located conferences and will attract over 200 top decision makers. LNG Suppliers, Traders, Ship Owners and builders will convene to address commercial, regulatory, supply-demand, price and global market issues.

More info

Contact Details:
Email: register@ibcasia.com.sg
Telephone: +65 6508 2401
Fax: +65 6508 2407
Mail: IBC Asia (S) PTE LTD, 111 Somerset Road, TripleOne Somerset #10-06 Singapore 238164

read more >

7th Bunkering in Asia 2015 Conference

If Quality and Compliance challenges were not enough, oil prices have provided a further twist to industry dynamics. Further, recent developments have yet again resulted in a review of credit and counter party risk management within the value chain.

What then should the industry response be? How can we look ahead and determine strategies that have a positive impact on our business? If tapping successfully into new market segments was high priority, assessing watertight alternatives to protect your business is of equal importance.

Part of The Bunkering Week, the 7th Bunkering in Asia is back in Singapore to provide networking, expert viewpoints, and commercial opinions that matter.

More info

Contact Details:
Email: register@ibcasia.com.sg
Telephone: +65 6508 2401
Fax: +65 6508 2407
Mail: IBC Asia (S) PTE LTD, 111 Somerset Road, TripleOne Somerset #10-06 Singapore 238164

read more >

Scrubber Summit Conference 2015

When reviewing the Exhaust Gas Cleaning System investment, vessel route, the amount of time spent in an ECA region and long term HFO – MGO differentials are just some of the issues ship owners’ are grappling with.

The drop in oil prices though has shifted the market economics of investments in Exhaust Gas Cleaning Systems. Long touted as a viable option for complying with low sulphur regulations, the industry is now actively evaluating HFO – Scrubber economics, and taking decisions to embraced scrubber technology.

The Scrubber Summit is your platform to raise questions and get commercial and technical solutions from technology experts and ship owners. It is part of a suite of events in The Bunkering Week, which incorporates 3 co located conferences and will attract over 200 top decision makers.

More info

Contact Details:
Email: register@ibcasia.com.sg
Telephone: +65 6508 2401
Fax: +65 6508 2407
Mail: IBC Asia (S) PTE LTD, 111 Somerset Road, TripleOne Somerset #10-06 Singapore 238164

read more >