Technip Orders Crane and Flexlay System from Huisman (The Netherlands)

Technip Orders Crane and Flexlay System from Huisman (The Netherlands)

Huisman, the specialist in lifting, drilling and subsea solutions, has secured new contracts with Technip, a world leader in project management, engineering and construction for the energy industry, for a 500mt Yard Crane and a 150mt Flexlay System.

Both the crane and the pipelay system will be designed and constructed by the Huisman facilities in the Netherlands and the Czech Republic. Previously, Huisman delivered the installation equipment onboard Technip’s flagship deepwater pipelay and subsea construction vessel, “Deep Blue”.

The 500mt Yard Crane is the third crane of this type built by Huisman, however the first to be used for onshore purposes. This state-of-the-art crane derives from Huisman’s many years of experience in the design, fabrication and service of heavy lifting equipment. The full revolving crane combines unique technical features, such as a full electric variable frequency drive system, a low overall construction weight and a small minimum operating radius. Furthermore all the major equipment, such as the hoist winches, is installed inside the enclosed crane house. These technical features result in a low power consumption, lower operational costs and maximum operability. The crane will be installed, commissioned and tested at Technip’s Flexi France facility in Le Trait, France, mid-2013.

The 150mt Flexlay System will be designed and built for the installation of flexible pipelines. The system can be separated into two modules, allowing for easy installation onboard. A definite first for a Flexlay System of this size is the two openable and retractable 75mt tensioners which allow for safe and efficient installation of large subsea infrastructure components such as umbilicals, risers and flowlines. The system’s deepwater lowering function allows for installation in up to 3,000m water depth. Delivery of the 150mt Flexlay system is scheduled for the end of 2013.

Huisman currently has a number of cranes in production, varying from 300mt to 4,000mt, and a 5,000mt Offshore Mast Crane is currently being finalized. Pipelay systems currently under construction include Multi-lay Systems for the Aegir and a new build vessel for Ezra, a Flexlay System for the newest Subsea 7 vessel and the S-lay System for the Seven Borealis.

Source: Huisman, April 5, 2012

Share this article

Follow World Maritime News

In Depth>

Events>

<< Aug 2015 >>
MTWTFSS
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 1 2 3 4 5 6

16th Annual FPSO World Congress 2015

This year, we will bring together more than 750 key stakeholders from oil companies, vessel owners, shipyards, financial organisations…

read more >

Marintec South America

Marintec – South American Maritime Exhibition for Shipbuilding, Platform and Maintenance

As part of the UBM/Seatrade portfolio, Marintec South America is a trade-show for anyone who wants to stay ahead in the maritime market.

Why visit?

  • Be inspired by thousands of products and services on show
  • Find out what´s new in the market by chatting to suppliers and peers
  • Come away with genuine solutions, exciting ideas, and a fresh outlook
  • Pick up new ideas from the experts of industry through our seminar sessions and technical presentation

Why Exhibit in Rio de Janeiro/ Brazil?

  • Rio de Janeiro is the headquarter of Petrobras and its mains shipyards / ship owners
  • Rio de Janeiro is an international reference center for training of professionals for the offshore oil and gas industry
  • Brazil produces over 2 million barrels of oil per day and the offshore production will double this by 2020
  • The Brazilian shipbuilding industry has been grown 19,5% per year since 2000
  • Investments in the industry should exceed BRL 200 billion before 2020
  • The oil and gas industry reached about 12% of the total Brazilian GDP and may reach 20% by 2020
  • The offshore exploration will move R$ 3.7 trillion over the next 30 years and will generate 87 million jobs
  • Petrobras’ total pre-salt needs estimate: 97 platforms, 510 support vessels and 140 oil tankers

Read more about the conference here.

read more >

Salvage & Wreck Asia 2014

At Asia’s only specialist salvage and wreck removal conference, delegates heard from industry leaders on topics including…

read more >

PIANC SMART Rivers Conference

The SMART Rivers Conference is a biennal forum bringing together those involved in river transport form developing and developed countries…

read more >