Norway: New Type of Drilling Rig to Improve Recovery

Norway - New Type of Drilling Rig to Improve Recovery

Statoil is preparing an invitation to tender for a new type of drilling rig for mature fields on the Norwegian continental shelf (NCS).

The new rigs, known as category J, will be jack-ups designed by the industry on behalf of Statoil.

Statoil will propose for licence groups to take on ownership of these rigs.

In order to realise the full potential of the NCS, increasing drilling activity on mature fields is important. Lower rig rates, greater drilling efficiency and access to rigs are key factors to meet this challenge. The new rig concept is designed to meet these requirements.

“The key to maintain today’s production level on the NCS towards 2020 is improved recovery from existing fields and fast and effective development of new fields. We need to drill more wells to deliver on our production ambitions,” says Øystein Arvid Håland, head of drilling and well in Statoil.

New tailor-made rigs

The new category J rigs will be able to operate at water depths from 70 to 150 meters and drill wells down to 10,000 meters. It is a tailor-made jack-up rig for operations in harsh environment on both surface- and subsea wells in the shallow-water segments on the NCS.

It will be a tool primarily for drilling and completion of production wells.

Driving technology and innovation

“Statoil has the capacity and competence to drive technology and innovation to drill more efficiently and rejuvenate the rig fleet on the NCS. The new category J rigs will deliver wells 20% more efficient than conventional rigs. We aim to achieve reduced cost and time per well with safe and efficient operations,” says Håland.

The rig design is currently being developed in collaboration with various industry players like hull designers, topside suppliers, construction yards and drilling contractors.

Reducing costs by taking ownership

“Statoil is continuously working to secure a rig fleet with the right capacities and capabilities to suit our needs. However, upgrade and adaptions on many of the existing rigs appear too costly for our requirements and challenges on the NCS. We are therefore taking steps to rejuvenate the rig fleet and ensure that the right rigs meet the right requirements,” says Jon Arnt Jacobsen, chief procurement officer in Statoil.

“Now we follow up our industrial approach by proposing to take ownership of the rigs through licenses to improve economics further. As a long-term industrial player on the NCS, we look forward to working with suppliers who have competence in building and operating rigs to develop new and cost-effective solutions,” says Jacobsen.

Statoil plans for invitation to tender for minimum two cat J rigs to be issued in July and for the contracts to be awarded in the 2nd half of 2012. The rigs are to be delivered in the 2nd half of 2015.

Source: Statoil, March 2, 2012

Share this article

Follow World Maritime News

In Depth>


<< Nov 2015 >>
26 27 28 29 30 31 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6

Salvage Law & Practice Seminar

Salvage Law & Practice at a glance:
Lloyd’s Open Form – contract design, administration and recent cases
special compensation awards…

read more >

CWC Sixteenth World LNG Summit & Awards Gala Dinner

The summit will provide a perfect opportunity to understand how key players are responding to the price fluctuations and what the outlook…

read more >

International WorkBoat Show

The event offers considerable opportunities to participating business houses to strengthen their business networks, and get familiar with…

read more >

Marintec China 2015, Shanghai, China


Facts & Figures of Marintec China:
• The exhibition spread over 70,000 square metres in Shanghai New International Expo Centre
• Over 1,700 exhibiting companies were participating in the event
• 57,888 quality trade visitors from 88 countries/regions
• 16 national & regional pavilions from Austria, China, Denmark, Finland, France, Germany, Hong Kong SAR, Japan, Korea, the Netherlands, Norway, Singapore, Sweden, Taiwan region, the United States and the United Kingdom were organised

About Marintec China

Marintec China 2015 will be held on 1-4 December 2015 in Shanghai. With increasing worldwide recognition and reputation throughout the past three decades, the exhibition is attracting an increasing number of high-profile exhibitors and visitors from around the world.

Regarded as the only gateway to the Asian maritime market, Marinetech China has become larger than ever! Being the most recognized maritime trade show in Asia, Marintec China is definitely an international marketplace for buyers to source from international sellers showcasing their latest marine, ship design, offshore engineering and port technology.

Over the years, Marintec China has grown to reflect the size and importance of the Asian maritime market. Marintec China 2013 has broken all the previous records attracting more than 1,700 exhibiting companies from 32 countries /regions and 16 group pavilions, making it the most international and authorised industry event in Asia. Taking place once every two years, Marintec China 2015 edition is a unique opportunity for suppliers to connect with new customers and re-connect with existing contacts from the region, and final one to present new products and services to the trade visitors and experts from all parts of the world.

Visit Marintec China 2015 website for more details

read more >