DSME Divides Allseas Pieter Schelte into Two

Hull No. 3401, Allseas Pieter Schelte platform decommissioning and pipe laying vessel, float division was finished on 11th May. With a total building sum of over 1.3 billion Euros (approx $1.7 Bln) it is the biggest project ever constructed at DSME’s Okpo shipyard.

Division work ended one month after the first cutting work which began on 26th April. The division work was planned in order to increase the ship’s width by 6.75m. After increasing the width, it will be possible for this vessel to lift most of the platforms installed around the world.

DSME won the Allseas project in 2010 and it will be the world’s biggest platform decommissioning and pipe laying vessel. When finished, the vessel will be 328m long, 117m wide, and 30m high.

Shipbuilding Tribune Staff, June 7, 2013

Share this article

Follow World Maritime News

Posted on June 7, 2013

In Depth>

Events>

<< Oct 2017 >>
MTWTFSS
25 26 27 28 29 30 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

Green Ship Technology North America

Survival of the fittest in maritime: Make smart investments, ensure you are compliant, future proof your fleet…

read more >

FCCA Cruise Conference & Trade Show

The ​FCCA ​Conference ​is ​a four-day ​event ​designed ​to ​foster ​a ​better ​understanding ​of ​the ​inner ​workings ​of ​the ​cruise…

read more >

Bulk Liquid Storage Europe 2017

The event will cover current key challenges and issues faced by the industry and provide in depth discussions and analysis of today`s…

read more >

3RD ANNUAL GENERAL AVERAGE SEMINAR

ATTEND THIS SEMINAR TO:
– Get up to speed on the revisions to the York-Antwerp Rules 2016…

read more >