Fincantieri Completes Refit of Carnival Sunshine

Autronica Fire and Security AS have completed the first major refit project on a passenger vessel for its flagship AutroSafe 4 fire detection system. The refit of the fire detection system aboard Carnival Sunshine took place at the Fincantieri yard in Trieste, Italy, during April and May 2013.

Called Carnival Destiny prior to its US$ 155 – million dollar makeover, the 3006 passenger capacity Carnival Sunshine launched on May 5th 2013. The renovations at Fincantieri included the addition of Carnival’s Fun Ship 2.0 dining, bar and entertainment features, and an additional 182 staterooms.

Safety systems were also a key aspect of the renovations, with AutroSafe 4 chosen as one of the world’s most advanced maritime fire detection systems. As Carnival Destiny, this one time ‘World’s largest passenger ship’ already had the legacy Autronica BS100 fire detection system on board, making the upgrade to the latest AutroSafe 4 technology relatively straightforward.

The refit for Carnival Sunshine re-used many of the detectors and loops already installed on the vessel and focused on the upgrade of bridge control panels to ensure all features of the AutroSafe 4 system are available.

AutroSafe 4 is one of the world’s leading fully addressable fire detection systems and is specified on a large number of new build ships of all kinds,” comments Jon – Arne Simonsen, Regional Sales Manager & Application Manager Detection , Autronica . “However, there is also considerable potential in the refit market, especially considering the current trend of passenger and cruise vessel owners focusing on investment in safety systems.”

Autronica is also currently installing AutroSafe 4 on two car carriers in the Bahamas and China. The refits are similar to Carnival Sunshine, with installation of new fire detection control panels on the bridge and re-use of much of the existing detector network. Autronica will also complete AutroSafe 4 refit installation s on two further car carriers for the same owner during summer 2013. AutroSafe 4 is designed to meet all requirements in the high-end merchant, cruise and offshore vessel segment s, as well as oil & gas platforms , and is certified according to European directives (CPD) requiring EN 54 compliance and have Factory Mutual (FM) approval according to NFPA 72.

Press Release, June 7, 2013; Image:

Share this article

Follow World Maritime News

Posted on June 7, 2013

In Depth>

Events>

<< Aug 2015 >>
MTWTFSS
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 1 2 3 4 5 6

16th Annual FPSO World Congress 2015

This year, we will bring together more than 750 key stakeholders from oil companies, vessel owners, shipyards, financial organisations…

read more >

Marintec South America

Marintec – South American Maritime Exhibition for Shipbuilding, Platform and Maintenance

As part of the UBM/Seatrade portfolio, Marintec South America is a trade-show for anyone who wants to stay ahead in the maritime market.

Why visit?

  • Be inspired by thousands of products and services on show
  • Find out what´s new in the market by chatting to suppliers and peers
  • Come away with genuine solutions, exciting ideas, and a fresh outlook
  • Pick up new ideas from the experts of industry through our seminar sessions and technical presentation

Why Exhibit in Rio de Janeiro/ Brazil?

  • Rio de Janeiro is the headquarter of Petrobras and its mains shipyards / ship owners
  • Rio de Janeiro is an international reference center for training of professionals for the offshore oil and gas industry
  • Brazil produces over 2 million barrels of oil per day and the offshore production will double this by 2020
  • The Brazilian shipbuilding industry has been grown 19,5% per year since 2000
  • Investments in the industry should exceed BRL 200 billion before 2020
  • The oil and gas industry reached about 12% of the total Brazilian GDP and may reach 20% by 2020
  • The offshore exploration will move R$ 3.7 trillion over the next 30 years and will generate 87 million jobs
  • Petrobras’ total pre-salt needs estimate: 97 platforms, 510 support vessels and 140 oil tankers

Read more about the conference here.

read more >

Salvage & Wreck Asia 2014

At Asia’s only specialist salvage and wreck removal conference, delegates heard from industry leaders on topics including…

read more >

PIANC SMART Rivers Conference

The SMART Rivers Conference is a biennal forum bringing together those involved in river transport form developing and developed countries…

read more >