Rosatomflot to Construct World's Largest Nuclear Icebreaker

Rosatomflot has revealed its plans to construct an LK60, the largest and most powerful nuclear icebreaker ever built, that will be deployed in the Northern Sea Route. Vyacheslav Ruksha, General Director of Rosatomflot, says to BarentsObserver.com that the estimated cost for a new icebreaker is € 1.1 billion (approx $ 1.4 billion) and is already included in Rosatomflots’s 2012 budget.

The tender for a new icebreaker will be announced this summer and the construction contract will probably be signed in September. If everything goes according to plan, the construction will commence by the end of 2012 and the newbuild might be ready for traffic by 2018.

Russia is the major player in deploying nuclear icebreakers for shipping in the Arctic and other freezing seas. The company wants to develop its fleet that would be a key element of the Northern Sea Route infrastructure thus the new generation nuclear icebreaker is being designed.

The LK60 icebreaker is designed to maneuver through three meters of ice with its supreme power of 60 MW. This is exactly what Rosatomflot needs to open the Northern Sea Route for commercial traffic all year around. Her draught varies ranging from 8.5 m to 10.8 m. The new design features maximum width of 34 meters, compared to the maximum of 30 meters width at the Arktika class vessels. Such a design will be capable of providing support to larger tankers through the northern sea route.

The LK60 icebreaker will replace one icebreaker of the Arktika class and one icebreaker of Taimyr class.

(1 Euro = 1.32300 U.S. dollars)

Shipbuilding Tribune Staff, February 22, 2012

Share this article

Follow World Maritime News

Posted on February 22, 2012

In Depth>

Events>

<< Feb 2017 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 1 2 3 4 5

9th Annual Coasts and Marine Structures 2017 Conference

Discover Best Practise Strategies for Design, Planning, Construction and Asset Management

To remain competitive, Australian port operators must plan, design, manage and maintain their assets more creatively and proactively to meet future demands and drive profitability.

With this in mind, the Coast and Marine Structures Summit 2017 will focus on key considerations relevant to ensuring your existing assets are maximised and prepared to accommodate bigger vessels.

Hear from 20+ global experts including Maritime/Coastal Engineers, Contractors, Port Authorities and more, including GHD (USA), Indonesian Port Corporation (Asia), G-Group Consulting (New Zealand), Ausenco (Australia), Port Authority NSW (Australia), to name a few.

By attending this 2-day conference, you’ll learn about:

– Innovative planning and design of ports to create efficiencies that drive profit
– Best practice asset management strategies and new PIANC design principles for bulk terminals
– Proactive asset management and maintenance to improve durability and maximise and extend asset lifecycles
– Alternative material and protection techniques trialled and tested in the US and Europe
– Strategies to shift organisational culture and mindset from asset management to asset maintenance
– How you can leverage technology to increase the efficiency of your marine structures
– Case studies on retrofitting, expanding and upgrading your ports in cost-effective ways

More info

read more >

European Shipping Week 2017

European Shipping Week is intended to be a platform where policy-makers from the main EU institutions will meet and engage with European…

read more >

SNS2017 – The Southern North Sea Conference & Exhibition

EEEGR’s flagship Southern North Sea conference is the most important event for the energy sector in the East of England…

read more >

Seatrade Cruise Global

For more than 30 years, Seatrade Cruise Global has been the leading international exhibition and conference serving the cruise industry…

read more >