Australia: Heerema Marine Wins Subsea Installation Contract for Ichthys Project

McDermott Australia (McDermott) has awarded Heerema Marine Contractors Australia Pty Ltd (HMC) a contract to transport and install infield flowlines, subsea structures and moorings for the INPEX Ichthys LNG Project.

McDermott Australia has been appointed the main contractor for the subsea umbilical, riser, flowline (SURF) project by INPEX. McDermott will work with HMC on the complex offshore installation campaign. HMC will carry out the transportation and installation of a portion of the offshore scope, utilizing the heavy lift, J-Lay and Reel-Lay capability of Heerema’s new-build vessel Aegir.

Scope of work

HMC’s scope of work includes the transportation and installation of flowlines, production flowlines, integrated pipeline structures, large subsea structures, a subsea riser support structure, and moorings for future FPSO and CPF facilities. All pipeline production welding, both onshore and offshore, will be carried out by HMC’s subsidiary Pipeline Technique Ltd.

Aegir’s cutting-edge technology

The project logistics are of an unprecedented scale in HMC’s subsea track record. It involves lowering over 100,000 tonnes of project materials to the seabed in water depths up to 275 meters.

HMC’s Executive Vice President Commercial & Technology Steve Preston says: “This is a really exciting opportunity for us, not only because of the enormous scope of the project, but also because we will be able to demonstrate the groundbreaking capabilities of our new vessel Aegir. We will be able to use its heavy lift, J-Lay and Reel-Lay capabilities all in one project.”

Ichthys LNG Project

The Ichthys LNG Project is a joint venture between INPEX (76%, the Operator) and Total (24%). Gas from the Ichthys Field, in the Browse Basin approximately 200 kilometers offshore Western Australia, will undergo preliminary processing offshore to remove water and extract condensate. The gas will then be exported to onshore processing facilities in Darwin via an 889-kilometer subsea pipeline. The Ichthys LNG Project is expected to produce 8.4 million tonnes of LNG and 1.6 million tonnes of LPG per annum, along with approximately 100,000 barrels of condensate per day at peak.

Heerema Marine Contractors is a world-leading marine contractor for the oil and gas industry. HMC transports, installs, and removes all types of offshore facilities and operates three of the four largest crane vessels in the world. HMC is a fully-owned subsidiary of the Heerema Group.

Shipbuilding Tribune Staff, February 13, 2012; Image: heerema

Share this article

Follow World Maritime News

Posted on February 13, 2012

In Depth>

Events>

<< Aug 2015 >>
MTWTFSS
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 1 2 3 4 5 6

16th Annual FPSO World Congress 2015

This year, we will bring together more than 750 key stakeholders from oil companies, vessel owners, shipyards, financial organisations…

read more >

Marintec South America

Marintec – South American Maritime Exhibition for Shipbuilding, Platform and Maintenance

As part of the UBM/Seatrade portfolio, Marintec South America is a trade-show for anyone who wants to stay ahead in the maritime market.

Why visit?

  • Be inspired by thousands of products and services on show
  • Find out what´s new in the market by chatting to suppliers and peers
  • Come away with genuine solutions, exciting ideas, and a fresh outlook
  • Pick up new ideas from the experts of industry through our seminar sessions and technical presentation

Why Exhibit in Rio de Janeiro/ Brazil?

  • Rio de Janeiro is the headquarter of Petrobras and its mains shipyards / ship owners
  • Rio de Janeiro is an international reference center for training of professionals for the offshore oil and gas industry
  • Brazil produces over 2 million barrels of oil per day and the offshore production will double this by 2020
  • The Brazilian shipbuilding industry has been grown 19,5% per year since 2000
  • Investments in the industry should exceed BRL 200 billion before 2020
  • The oil and gas industry reached about 12% of the total Brazilian GDP and may reach 20% by 2020
  • The offshore exploration will move R$ 3.7 trillion over the next 30 years and will generate 87 million jobs
  • Petrobras’ total pre-salt needs estimate: 97 platforms, 510 support vessels and 140 oil tankers

Read more about the conference here.

read more >

Salvage & Wreck Asia 2014

At Asia’s only specialist salvage and wreck removal conference, delegates heard from industry leaders on topics including…

read more >

PIANC SMART Rivers Conference

The SMART Rivers Conference is a biennal forum bringing together those involved in river transport form developing and developed countries…

read more >